INSIDE PROJECT LAGOON

Inside Project Lagoon

A Guided Walkthrough of the Fleet, Technology and People Behind the Mission

Follow a Project Lagoon operation from the first survey plan to the final documented recovery. Along the way, see what Space Coast Water Sweep already has in service, what has been personally committed to the mission, what it costs to operate today, and what capabilities are still needed to expand the work.

CHAPTER 01

The Commitment Behind Project Lagoon

Personal investment, nonprofit resources, and a long-term plan to build a professional lagoon survey and recovery operation.

CURRENT
Two SCWS researchers aboard the survey boat reviewing sonar data while a drone surveys overhead and an ROV stands ready on deck — the full suite of technology committed to the mission

Illustrative image — real SCWS field photographs coming soon

Project Lagoon is not a concept waiting for funding. It is already being developed through personal commitment, nonprofit investment, donated resources, volunteers, partnerships, and a long-term plan to build a professional lagoon survey and recovery operation.

The boat, the motor, the conversion work, the field testing, and the early operations are all real. They exist today because individuals and the organization have put their own time, equipment, and resources on the line to prove the model works before asking others to help it grow.

WHAT WE HAVE TODAY

  • Existing 18-foot work boat in service
  • New outboard motor — installation in progress
  • Boat conversion work underway (electronics mounting); center-console built
  • Personal time and vessel use committed by leadership
  • Volunteer service from trained community members
  • Equipment already being acquired or installed
  • Early field testing and operations conducted

WHAT WE ARE BUILDING TOWARD

  • A dedicated, professionally equipped survey and recovery operation
  • Full-time paid survey and recovery teams
  • A fleet of purpose-built vessels
  • Permanent operations and staging facility
  • Sustained, year-round lagoon coverage
01 / 21
CHAPTER 02

Preparing the Field Operation

Everything that happens before the boat launches.

CURRENT
Four-person Project Lagoon team conducting a pre-deployment briefing around the survey boat on its trailer at the boat ramp, reviewing the mission plan on a tablet

Illustrative image — real SCWS field photographs coming soon

A successful Project Lagoon operation begins long before the boat leaves the dock. Preparation is what makes the difference between a productive survey and a wasted day on the water.

The team reviews the assigned zone, checks access points and water conditions, monitors weather, charges every battery, prepares tablets and cameras, loads retrieval equipment, confirms the survey team, and plans GPS survey routes — all before the boat is in the water.

WHAT WE HAVE TODAY

  • Survey zone selection process using assigned Adopt a Lagoon Zone areas
  • Access and condition review before each operation
  • Weather monitoring before launch
  • Safety equipment checklist and preparation
  • Battery charging and electronics preparation
  • Tablet and camera preparation with GPS enabled
  • Retrieval equipment loading
  • Survey team confirmation and communication check
  • GPS survey route planning
02 / 21
CHAPTER 03

The Survey and Work Boat

How the current boat is being transformed into a practical Project Lagoon field platform.

CURRENT & EXPANDING
Project Lagoon survey boat in operation on the lagoon — operator at the helm with GPS/sonar display, scientist reviewing a tablet, drone secured on the aft deck near mangrove shoreline

Illustrative image — real SCWS photograph of survey boat coming soon

The current 18-foot boat is being converted from a standard recreational vessel into a practical Project Lagoon field platform. A new motor is being installed. A center-console conversion has been built; installation status to be confirmed. Electronics, equipment mounting, storage, and safety gear are being installed step by step.

Every component is clearly identified: SCWS-owned, personally provided for mission use, donated, being installed, or planned. This transparency is part of the commitment — the public can see exactly what exists and what is still needed.

WHAT WE HAVE TODAY

  • 18-foot boat — personally owned (planned to be donated and registered to SCWS after marina work is complete)
  • New outboard motor — installation in progress
  • Center-console conversion — built; installation status to be confirmed
  • Standing work position at the helm
  • Electronics mounting — being installed
  • Equipment storage — being configured
  • Safety equipment — onboard and being expanded

WHAT WE ARE BUILDING TOWARD

  • A dedicated, purpose-built survey vessel (approximately 24-foot)
  • Enclosed pilothouse for all-weather operations
  • Integrated advanced sonar package
  • Professional equipment mounting and power systems
  • Redundant survey vessel for parallel coverage
Stern of the Project Lagoon boat showing the outboard motor, GNSS receiver antenna, and equipment at a wooden pier

Illustrative image — real SCWS field photographs coming soon

03 / 21
CHAPTER 04

Following the GPS Survey Route

GPS tracks document where the team traveled and which parts of a zone were surveyed.

CURRENT
Aerial view of a GPS lawnmower survey grid overlaid on a mapped lagoon zone with parallel survey lanes and waypoints

Illustrative image — real GPS track screenshot coming soon

Every Project Lagoon survey follows a planned GPS route. The tracks left behind are not just a record — they are proof of coverage. They show which lanes were run, which areas were missed, and where the team has already been.

Assigned zones, survey lanes, GPS tracks, and coverage progress are all visible on the platform. Adopters can see their zone being surveyed. Repeat surveys and resurveys after recovery confirm that the work is holding.

04 / 21
CHAPTER 05

Seeing the Shoreline from Above

Drones may support shoreline inspection, inaccessible-area observation, and visual documentation.

CURRENT & EXPANDING
Drone surveying Indian River Lagoon shoreline while the Project Lagoon boat works below

Illustrative image — real SCWS field photographs coming soon

Drones add a perspective that no boat can provide. From above, the team can inspect shorelines that are inaccessible by water, document conditions visually, and plan future survey routes. Drone use depends on applicable flight rules, location, weather, and operating conditions — it is a tool, not a replacement for on-water survey.

Current drone capabilities are limited but growing. Future planned improvements include longer flight time, better cameras, and specialized sensors.

WHAT WE HAVE TODAY

  • Basic drone capability for visual documentation
  • Shoreline observation from above
  • Photographic record of conditions

WHAT WE ARE BUILDING TOWARD

  • Longer-flight-time drones for extended coverage
  • Higher-resolution cameras and sensors
  • Specialized mapping and survey planning software
  • Trained drone operators with proper certifications
  • Systematic shoreline inspection program
05 / 21
CHAPTER 06

Finding What the Water Hides

Sonar, cameras, and ROV verification — how submerged objects become observations.

CURRENT & EXPANDING
Marine sonar display showing side-scan imagery of submerged debris — a tire and metal frame — detected on the lagoon floor

Illustrative image — real SCWS sonar screenshot coming soon

This is the heart of Project Lagoon. The water hides what has been lost, dumped, abandoned, and forgotten. Finding it requires more than one technology — it requires a combination of visual observation, multiple sonar types, cameras, and verification.

No single technology finds everything. Visual observation catches what is visible on the surface. Side-scan sonar sweeps wide areas. Down-scan sonar looks directly below. Live sonar shows real-time structure. 360-degree sonar sees in every direction. ROV verification confirms what the sonar found. Together, they build a complete picture of what the water hides.

WHAT WE HAVE TODAY

  • Visual observation from the boat
  • Side-scan sonar — being acquired
  • Down-scan sonar — being acquired
  • Basic camera documentation

WHAT WE ARE BUILDING TOWARD

  • Live sonar — planned, not yet purchased
  • 360-degree sonar for full surrounding coverage
  • ROV (remotely operated vehicle) for underwater verification
  • High-definition underwater cameras
  • Integrated sonar recording and mapping software
  • Trained sonar operators on every survey
Split-view of yellow ROV with LED floodlights inspecting an encrusted metal trap on the seafloor while the survey boat floats above on the lagoon surface

Illustrative image — real SCWS ROV inspection photograph coming soon

06 / 21
CHAPTER 07

Marking the Discovery

How a finding receives GPS coordinates, classification, and verification status.

CURRENT
Survey operator at the helm touching the chartplotter display showing a split-screen navigation chart and sonar depth readout, marking a debris discovery with GPS coordinates

Illustrative image — real SCWS photograph of marking process coming soon

When the team finds something, it does not get pulled out immediately. It gets marked. Every discovery receives GPS coordinates, a date and time stamp, photographs or sonar evidence, a debris classification, an estimated size, hazard information, and a verification status.

This is the moment a submerged object becomes a documented observation in the system — one that can be reviewed, verified, and eventually recovered.

Public safety principle: See It. Report It. Don't Disturb It. A public report helps SCWS document and map submerged debris, but it does not authorize recovery. Submerged debris should not be disturbed by the public. Observations are reviewed and verified by trained teams, and recovery occurs only when appropriate and authorized. Not every reported object is guaranteed to be recovered.

WHAT WE HAVE TODAY

  • GPS coordinates captured for every finding
  • Date and time stamp
  • Photographs or sonar evidence attached
  • Debris classification (trash, large debris, fishing debris, etc.)
  • Estimated size recorded
  • Hazard information noted
  • Reporter or supporter recognition
  • Verification status tracked
07 / 21
CHAPTER 08

From Field Observation to Digital Map

The technology built into the Project Lagoon platform.

CURRENT
First-person view from the helm showing the chartplotter screen with navigational channels and sonar depth readout, drone case visible on the deck at the boat ramp

Illustrative image — real SCWS screenshot of digital map coming soon

Every observation marked in the field flows into a digital operations system. Smart Reports, GPS tracks, observation pins, Project Lagoon Live, Hidden Waters findings, and Adopt a Lagoon Zone recognition all connect on the same map.

Administrators verify findings, assign recovery targets, and report progress publicly. The visitor does not need to navigate a database — they see a living map of what has been found, what has been verified, and what has been recovered.

08 / 21
CHAPTER 09

Verifying Before Recovery

Finding an object does not automatically mean it can be immediately removed.

CURRENT
SCWS operations team reviewing sonar images, maps and recovery requirements on a large screen before authorizing fieldwork

Illustrative image — real SCWS photograph of verification and review process coming soon

Discovery is only the first step. Before anything is recovered, the team reviews the finding, researches ownership questions, confirms whether FWC or other authorization is required, assesses safety, checks for wildlife concerns, identifies hazardous materials, confirms required equipment, plans disposal, and confirms funding and staffing.

This is not bureaucracy — it is responsible operations. Some items require permits. Some belong to someone else. Some pose risks that require specialized handling. Verification protects the team, the public, and the environment.

Prioritization and hotspot identification: Survey teams can continue documenting an area until enough verified recoverable targets are identified to justify a focused recovery mission. Rather than sending a recovery crew every time someone sees one piece of debris, Project Lagoon groups targets into prioritized recovery areas. Prioritization factors include multiple debris observations, debris density, known hazards, storm-related accumulation, environmentally sensitive areas, repeated observations, operational efficiency, and agency priorities.

WHAT WE HAVE TODAY

  • Review of every finding before recovery
  • Ownership research where applicable
  • FWC and authority authorization process
  • Safety assessment for each target
  • Wildlife concern evaluation
  • Hazardous materials identification
  • Required equipment confirmation
  • Disposal planning
  • Funding and staffing confirmation
09 / 21
CHAPTER 10

Recovering the Debris

Current recovery methods and future capabilities.

CURRENT & PLANNED
Project Lagoon crew recovering debris from shallow mangrove water — one team member wading with a grabber pole to lift a submerged bucket while another organizes tangled rope on the boat

Illustrative image — real SCWS photograph of recovery operation coming soon

Once a finding is verified and authorized, the recovery team goes to work. Today, recovery uses hand tools, hooks, poles, magnets, and grappling equipment. The team lifts, rigs, and transports debris safely back to shore for disposal or recycling.

Future capabilities will expand what can be recovered — recovery pontoons with crane or boom systems, work barges, and heavy equipment for larger targets. Every recovery is planned, documented, and executed with safety as the first priority.

The current Project Lagoon operating model does not use volunteer divers for underwater debris recovery. The public should not enter the water to retrieve submerged objects. Recovery is conducted by trained teams using appropriate equipment and authorization.

Project Lagoon is not a derelict-vessel salvage program. Vessel-related observations may be documented and referred to appropriate authorities, but Project Lagoon does not present vessel removal as an operational capability.

Resource recovery and responsible material handling: Recovered material is not simply discarded. It enters a controlled process of documentation, inspection, sorting and responsible routing. The responsible hierarchy is: AVOID → REDUCE → REUSE → REPAIR / REPURPOSE → RECOVER MATERIAL → CONVERT WHERE APPROPRIATE → RECYCLE → RESPONSIBLE DISPOSAL. Recovered material is sorted into general debris, recyclable metal, organic material, fishing/crab gear, recoverable reusable materials, and hazardous or special-handling materials where encountered. This is a responsible operating preference, not a zero-waste or sustainability certification claim.

CURRENT RECOVERY CAPABILITY

  • Hand tools
  • Hooks and poles
  • Magnets
  • Grappling equipment
  • Basic lifting and rigging
  • Baskets for transport
  • Disposal and recycling

FUTURE RECOVERY CAPABILITY

  • Recovery pontoons with crane or boom systems
  • Work barges for large-scale recovery
  • Heavy equipment for oversized targets
  • Specialized rigging for vessels and structures
  • Integrated debris-processing equipment
10 / 21
CHAPTER 11

Documenting the Result

Before-and-after photographs, recovery team credit, and final zone reports.

CURRENT
Before-and-after recovery record showing submerged debris removed, GPS location, and completed status

Illustrative image — real SCWS photograph or record screenshot coming soon

Recovery is not complete until it is documented. The team captures before-and-after photographs, records the actual recovery team credit, weighs and classifies the debris type, records the disposal or recycling method, logs volunteer and staff hours, tracks recovery costs, updates the map status, and produces a final zone report.

This documentation is what makes the work credible. It is what funders, partners, adopters, and the public can see and trust.

WHAT WE HAVE TODAY

  • Before-and-after photographs
  • Actual recovery team credit
  • Weight and debris type recorded
  • Disposal or recycling method documented
  • Volunteer and staff hours logged
  • Recovery costs tracked
  • Updated map status
  • Final zone report
11 / 21
CHAPTER 12

Returning to Resurvey

Why SCWS returns after removal.

CURRENT
Project Lagoon boat returning along the same GPS survey route after debris recovery, with a recovered tire in the bin and a completed-status path overlay

Illustrative image — real SCWS photograph of resurvey operation coming soon

Recovery is not the end. The team returns to the same GPS survey route after removal to confirm the target is gone, look for nearby debris, measure the cleared area, compare conditions, monitor for recurring debris, and build long-term trends.

This is what separates Project Lagoon from a one-time cleanup. It is sustained, documented, and verified — the lagoon is not just cleaned once, it is monitored over time.

Every mission can teach us something about the Lagoon. Over time, Project Lagoon data may help identify patterns and trends that improve conservation effectiveness: debris hotspots, recurring accumulation areas, storm impacts, debris types, recovery trends, areas needing repeat survey, environmental patterns, operational effectiveness, cost and effort per recovery area, and future restoration opportunities. As the system grows, data connections to Currents Through Time, the AI/Data Hub, research partners, university work and environmental reporting may create new opportunities for understanding the Lagoon.

WHAT WE HAVE TODAY

  • Post-recovery resurvey to confirm target is gone
  • Nearby debris search
  • Cleared area measurement
  • Condition comparison
  • Recurring debris monitoring
  • Long-term trend building
12 / 21
CHAPTER 13

The People Who Make It Work

The roles required to run a professional lagoon survey and recovery operation.

CURRENT & PLANNED
SCWS operations team working in the mission workshop — reviewing navigational maps on dual monitors, preparing drone equipment, and organizing field gear

Illustrative image — real SCWS photograph of the team and workspace coming soon

Project Lagoon is not just equipment — it is people. Today, the operation runs on volunteers and leadership who donate their time. As the program grows, these roles will transition to paid positions.

Every role listed here is real and needed. Some are filled today by volunteers. Some are filled by leadership. Some are planned for the future.

EXISTING VOLUNTEER ROLES & CURRENT LEADERSHIP

  • Program manager (volunteer/leadership)
  • Boat lead (volunteer/leadership)
  • Survey technician (volunteer)
  • Data reviewer (volunteer/leadership)
  • Recovery crew (volunteer)
  • Volunteer leader (volunteer)
  • Office coordinator (volunteer)

PLANNED PAID POSITIONS

  • Full-time program manager
  • Full-time boat lead / survey captain
  • Survey technician (paid)
  • Drone operator (paid, certified)
  • Sonar operator (paid, trained)
  • Data reviewer (paid)
  • Recovery crew (paid)
  • Mapping and reporting support (paid)
  • Equipment maintenance (paid)
13 / 21
CHAPTER 14

What It Costs to Operate Today

The real overhead required even at the current small scale.

CURRENT
Waterfront operations facility with docked survey boat, debris recovery crates, drone in flight, and glass-walled control room with GIS monitors

Illustrative image — real SCWS photograph of operations facility coming soon

Project Lagoon operates at three distinct levels, each with its own cost structure. Understanding all three helps supporters see exactly where the mission stands today, what it takes to sustain it, and what the full vision would cost.

Level 1 is the current founder-led, one-boat operation — real cash expenses, donated equipment, personally provided equipment, and volunteer hours. Level 2 is a preliminary planning range for a sustainable one-boat operation with paid staff and a small inland facility. Level 3 is the full County-scale proposal from the original Project Lagoon prospectus.

Cash expenses are displayed separately from donated or personally provided value. No fabricated totals are published. Every figure is administrator-editable and will be updated with verified amounts as they are confirmed.

THREE OPERATING LEVELS

  • Level 1 — Current SCWS field operation (founder-led, one-boat, volunteer-supported)
  • Level 2 — Sustainable one-boat operation ($350,000–$425,000 annually, plus insurance)
  • Level 3 — Full County-scale operation ($1,670,665 Year 1, plus insurance)
  • Cash expenses shown separately from donated and personally provided value
  • All figures administrator-editable with vendor quote tracking

LEVEL 1 — CURRENT SCWS FIELD OPERATION

The current founder-led, one-boat operation. Cash expenses are shown separately from donated and personally provided value.

VERIFIED CASH EXPENSES

Cash expenses being documented by SCWS administration.

DONATED & PERSONALLY PROVIDED VALUE

Donated and personally provided equipment being documented.

No fabricated total is published. SCWS administration enters verified cash expenses, donated equipment, personally provided equipment, donated professional services, and volunteer hours as they are confirmed.

LEVEL 2 — SUSTAINABLE ONE-BOAT OPERATION

Preliminary planning range: $350,000–$425,000 annually, plus final insurance costs.

WORKING MIDPOINT

$397,500

Range: $350,000–$425,000 annually, plus insurance
Program management and field personnel$180,000
Payroll costs and basic benefits$35,000
Small inland facility lease and operations$48,000
Boat and vehicle fuel$24,000
Fleet and equipment maintenance$25,000
Disposal, recycling and hauling$12,000
Communications and data$6,000
Field and office supplies$6,000
Training and credentials$5,000
Marine towing assistance$2,500
Public information and outreach$3,000
Permits and licenses$3,000
WRN platform and digital systems$12,000
Accounting and payroll support$15,000
Legal and compliance$7,500
Banking and transaction costs$3,000
Emergency and asset protection$7,500
Authorized mileage and travel$3,000
Preliminary Annual Total$397,500

Preliminary planning estimates adapted from the full Project Lagoon County proposal. Final costs require facility, insurance, staffing and vendor quotes. These are not approved expenses or confirmed quotes.

LEVEL 3 — FULL COUNTY-SCALE OPERATION

The original preliminary County proposal — the larger professional model. This funding has not been awarded.

CAPITAL & STARTUP

$750,225

ANNUAL OPERATING

$920,440

plus insurance

PRELIMINARY YEAR 1 TOTAL

$1,670,665

plus insurance

This level represents the larger professional model with:

  • • Dedicated survey crew
  • • Dedicated recovery crew
  • • Program management
  • • Office and data coordination
  • • Recovery pontoon
  • • Debris barge
  • • Two heavy-duty vehicles
  • • Compact track loader
  • • Dump trailer
  • • Expanded equipment
  • • Full operations facility
  • • Professional reporting and compliance

This funding has not been awarded. The figures are from the original preliminary Project Lagoon County proposal.

14 / 21
CHAPTER 15

What We Have Already Built

A visual summary of equipment, systems, and capabilities already available.

CURRENT
Project Lagoon equipment inventory laid out in the workshop — side-scan sonar display, ruggedized mapping tablet, GNSS dome antenna, yellow ROV in hard case, and transducer pole

Illustrative image — real SCWS photograph of equipment coming soon

This is what exists today — not a concept, not a plan, but real equipment, systems, and capabilities already in service or being installed.

Every item is categorized: In Service, Personally Provided for Mission Use, Donated, Funded and Ordered, Being Installed, or Being Upgraded.

VERIFIED CAPABILITY CATEGORIES

  • In Service — actively used in operations
  • Personally Provided for Mission Use — committed by leadership
  • Donated — given by supporters and partners
  • Funded and Ordered — purchased, awaiting delivery
  • Being Installed — physically being mounted or configured
  • Being Upgraded — existing equipment receiving improvements
15 / 21
CHAPTER 16

The Small Inland Operations Facility

A practical early operations base in the Cocoa area — not the future Conservation and Discovery Center.

CONCEPT
Conceptual Conservation & Discovery Center exterior with sweeping wood-clad roof, glass facade revealing a suspended AUV in an underwater exhibit, and a family approaching the entrance

Concept image — future Conservation & Discovery Center facility

Before the future Conservation and Discovery Center in Titusville, Project Lagoon needs a practical inland operations facility in the Cocoa area. This is not a waterfront property, not a museum, and not a visitor attraction — it is a working base for a nonprofit environmental field operation.

The concept is approximately 3,000–5,000 square feet of industrial space with a secure fenced yard, boat and trailer parking, one practical work bay, equipment storage, a small office and data workstation, PPE and safety storage, a battery-charging area, manual debris sorting, and recycling and disposal staging.

The final location, design, and size have not been selected. The preliminary $48,000 annual facility allowance in the Level 2 operating plan is a planning estimate — the actual amount depends on lease terms, property size, zoning, utilities, insurance, drainage, wash-water requirements, security, and required improvements.

FACILITY CONCEPT COMPONENTS

  • Inland Cocoa-area industrial location
  • Approximately 3,000–5,000 square feet (initial planning concept)
  • Secure fenced yard
  • Boat and trailer parking
  • One practical work bay
  • Equipment storage
  • Small office and data workstation
  • PPE and safety storage
  • Battery-charging area
  • Manual debris sorting
  • Sorting tables
  • Labeled rolling bins
  • Floor scale
  • Pallet jack and hand carts
  • Recycling and disposal staging
  • Covered temporary material storage
  • Controlled washing area if permitted
  • Space for routine equipment maintenance

WHAT THIS FACILITY IS NOT

  • Not a waterfront property
  • Not in Titusville
  • Not a public museum or visitor attraction
  • Not an automated sorting line
  • Not a large conveyor system
  • Not heavy manufacturing
  • Not the Conservation and Discovery Center
16 / 21
CHAPTER 17

Small-Operation Startup Plan

A preliminary scalable startup view for equipping a sustainable one-boat operation.

CONCEPT
Operational base with boat, equipment, and crew preparing for Project Lagoon field operations

Illustrative image — small-operation startup equipment and facility

This is a preliminary startup plan for equipping a sustainable one-boat Project Lagoon operation. The figures below are planning estimates — not approved expenses or confirmed quotes. Final costs require facility, insurance, staffing, and vendor quotes.

The startup total excludes the value of the current boat and new motor, which have already been funded or committed. Those items are shown separately in the 'Already Committed to the Mission' chapter.

PRELIMINARY STARTUP CATEGORIES

  • Survey electronics and observation platform — $12,500
  • ROV / underwater inspection system — $15,000
  • Drone improvements — $5,000
  • Recovery rigging and field equipment — $10,000
  • Manual sorting and material handling — $7,500
  • Facility setup and outfitting — $15,000
  • Shop and maintenance tools — $10,000
  • Computers, tablets and IT — $8,000
  • Safety, PPE and emergency equipment — $10,000
  • Asset identification and basic branding — $5,000
  • Initial water-screening capability — $5,000
  • Dump trailer — $15,000
  • Contingency — $6,000

STARTUP TOTALS (PRELIMINARY)

  • Startup excluding tow vehicle: approximately $124,000
  • Tow vehicle and outfitting (if required): approximately $65,000–$75,000
  • Startup including tow vehicle: approximately $190,000–$200,000
  • Current boat and new motor shown separately under 'Already Committed'
17 / 21
CHAPTER 18

Already Committed to the Mission

Equipment already owned, donated, personally provided, funded, or operational — the investment already made.

CURRENT
Two operators preparing equipment on a Project Lagoon survey boat at a boat ramp

Illustrative image — equipment and site preparation for operation

Project Lagoon is not starting from zero. Equipment, vessels, electronics, and resources have already been committed — owned by SCWS, personally provided for mission use, donated by supporters, funded and awaiting installation, or installed and operational.

This section distinguishes personally provided property from SCWS-owned assets. Each item is categorized, valued when possible, and shown with a photograph or interim illustrative image. Donor recognition is shown only when authorized.

ASSET CATEGORIES

  • SCWS-owned — owned by the organization
  • Personally provided — committed by leadership for mission use
  • Donated — given by supporters and partners
  • Funded and awaiting installation — purchased, awaiting setup
  • Being installed — physically being mounted or configured
  • Installed and operational — in active service
Committed assets are being documented by SCWS administration.
18 / 21
CHAPTER 19

The Project Lagoon Wish List

What SCWS needs to expand the mission.

FUNDING NEEDED
Specialized aluminum research vessel with deployed sonar sensor conducting field survey operations

Concept image — future Project Lagoon capability

The wish list is what SCWS needs to grow from a small volunteer operation into a sustained, professional lagoon survey and recovery program. Every item has a mission purpose, a priority, and a path to funding.

All images in this section are concept images — they show what the equipment would look like, not what SCWS already owns. Every concept image is clearly labeled.

WISH LIST ITEMS

  • Dedicated survey boat
  • Advanced sonar package
  • ROV (remotely operated vehicle)
  • Additional drones
  • Rugged tablets
  • Communications equipment
  • Recovery pontoon
  • Crane or boom system
  • Work barge
  • Dump trailer
  • Tow vehicles
  • Safety equipment
  • Debris-processing equipment
  • Survey and recovery staffing
Remotely Operated Vehicle (ROV) with camera and LED lights hovering above seagrass and submerged debris structure, tethered to a survey boat above

Concept image — future Project Lagoon capability: ROV for subsurface debris verification

Flat-deck aluminum pontoon work boat with hydraulic crane lifting a submerged metal frame from coastal waters near mangrove shoreline

Concept image — future Project Lagoon capability: recovery pontoon with crane for debris retrieval

19 / 21
CHAPTER 20

Building the Full Operation

How today's work grows into the future Project Lagoon and Conservation and Discovery Center operation.

CONCEPT
Aerial view of the full Conservation & Discovery Center campus at scale — glass visitor center, observation tower, mangrove boardwalk, survey boat dock, kayakers, and launch pads on the horizon

Concept image — full-scale campus and operation vision

Today's small boat and volunteer crew are the seed of something much larger. The vision is an integrated operation with dedicated survey and recovery teams, an operations yard, boat storage, debris sorting, equipment maintenance, data and mapping systems, drone/sonar/ROV capabilities, research collaboration, public education, and hurricane response capability.

This is a future vision — labeled clearly. It shows where the work is going, not where it is today.

Hurricane and post-storm response: Normal operations are the core mission. Hurricane and post-storm response is an additional capability — not the sole reason Project Lagoon exists. After a storm, time matters. The system may support post-storm assessment following the flow: ASSESS → MAP → PRIORITIZE → RECOVER → VERIFY. Project Lagoon is positioned as a supporting conservation capability — not a replacement for emergency management, law enforcement, FWC, Coast Guard, county government or other agencies.

FUTURE VISION COMPONENTS

  • Dedicated survey team
  • Dedicated recovery team
  • Operations yard
  • Boat storage
  • Debris sorting facility
  • Equipment maintenance shop
  • Data and mapping systems
  • Drone, sonar and ROV capabilities
  • Research collaboration program
  • Public education integration
  • Hurricane response capability
20 / 21
CHAPTER 21

Help Move the Mission Forward

Clear ways to participate in Project Lagoon.

CURRENT
Project Lagoon supporters and volunteers at the dock

Project Lagoon supporters and volunteers together on the dock — the community behind the mission.

Project Lagoon is built on participation. Whether you adopt a zone through hands-on stewardship, support a zone financially, help equip the survey team, fund survey technology, support recovery equipment, contribute to a wish list item, volunteer, or become a partner — every form of support expands what the mission can do.

Choose the path that fits your commitment. Every option connects to administrator-approved Zeffy links and existing participation pages.

Adopt Through Action

Adopt a four-mile lagoon zone through hands-on stewardship and survey work. Adopting a zone is free.

Support a Lagoon Zone

Support SCWS survey and recovery work in an adopted zone. SCWS surveys and recovers items as resources, conditions, and authorization allow; a donation does not guarantee complete coverage or recovery.

Support Current Operations

Help cover fuel, maintenance, insurance, and the real costs of keeping the boat on the water.

Support Operations

Help Equip the Survey Team

Fund the sonar, GPS, tablets, and communications equipment the survey team needs.

Fund Survey Technology

Support advanced sonar, ROV, and drone capabilities for finding what the water hides.

Support Recovery Equipment

Help acquire recovery pontoons, cranes, and rigging for larger debris targets.

Contribute to a Wishlist Item

Choose a specific item from the wish list and help fund it directly.

Volunteer

Join the team as a trained volunteer for surveys, recovery, and community events.

Become a Partner

Partner with Space Coast Water Sweep as a business, foundation, or organization.

21 / 21

The Mission Grows With You

We prepare. We launch. We survey. We detect. We verify. We map. We recover. We document. We return. We improve. Every step is real, and every step grows with your support.

Support Project LagoonAdopt a Lagoon Zone